top of page
BAE

Different segments of the proposed network based on business requirements Determine segment needs

Identify the different segments of the proposed network based on business requirements Determine segment needs, using network functional analysis Estimate traffic content and volumes based on business requirements Develop a prioritized organizational network functional matrix Determine the resource requirements for each network segment on the basis of functional analysis analyze features of the physical environment for the effect on network design Conduct a costing process for possible topology options Consider topology options with reference to available resources and network functional matrix Select and document appropriate network topology based on business requirements and functional analysis

Recent Posts

See All

Commentaires


bottom of page